The RIBA Plan of Work is a standard framework for architecture and construction projects. Developed by the Royal Institute of British Architects, it outlines the process of building projects from start to finish.
This framework creates clarity and aligns resources. It guides each stage to achieve quality outcomes. The plan splits into eight stages, numbered 0 to 7, each serving a specific purpose.
It begins with strategic definition, setting project goals. Then it progresses through preparation, concept design, and technical design, keeping everything on track for a smooth build.
Construction and handover follow, ending with post-occupancy evaluation. Each stage keeps projects organised and on target, providing a roadmap for successful delivery.
These stages help teams streamline processes, cut risks and improve results. Following this framework helps manage projects well and meet goals.
Collaboration and structure are vital in construction projects. The RIBA Plan of Work is essential in bringing everyone together—clients, architects, contractors, and consultants. It provides a clear path, ensuring everyone knows their role and responsibilities at each stage.
The RIBA Plan of Work creates a logical sequence of actions. This clear structure helps teams handle complex construction projects more effectively. Each stage, from initial concept to final handover, is defined clearly. This helps projects progress smoothly and stay well-managed.
With our WorkflowMax solution, we can help your construction or engineering firm enhance this process. Our software integrates with your project management systems to provide better scheduling tools and financial tracking. It helps you manage project complexity while maintaining financial control.
Our job management features and real-time insights complement the RIBA framework. Together, they keep your construction projects organised and financially on track.
The Royal Institute of British Architects in 66 Portland Place, London, W1.
Define the project strategy. Confirm the best approach to meet the client's needs. Establish a clear project plan, consider team members, and prepare a program.
Develop the project brief and assess feasibility. Assemble the project team, define roles, and prepare a risk assessment. Set up the procurement strategy and project timeline.
Create the initial design concept. Align it with the project brief. Develop architectural drawings, cost plans, and visualisations. Consult with local authorities for pre-application advice.
Refine the design and coordinate all components. Develop architectural, structural, and building services systems. Ensure spatial arrangements are harmonised and compliant with legal requirements.
Prepare detailed technical designs. Ensure they meet building regulations and compile them into a tender document set. Create thorough drawing packages and a detailed specification of the works.
Manufacture and construct the project. Oversee the construction phase, ensuring adherence to the design and quality standards. Monitor progress and manage any arising issues.
Complete the building and hand it over. Conclude the building contract. Ensure the client receives all necessary documentation and support for operating the building.
Operate and maintain the building efficiently. Conduct post-occupancy evaluations to assess performance and inform future projects. Ensure the building meets client and user expectations.
In the RIBA Plan of Work, several stakeholders play vital roles in ensuring the successful delivery of construction projects. Each has distinct responsibilities that contribute to the project's overall success.
Effective project delivery relies on clear communication and responsibility delegation among these participants. With WorkflowMax, firms can enhance this process by integrating advanced scheduling tools and financial tracking. This ensures everyone remains aligned and focused on achieving project goals efficiently.
This framework makes resource management better. By defining roles and timelines, it helps teams use resources efficiently, prevents waste, and keeps projects on schedule. The clear structure also reduces risks by improving communication.
With the RIBA Plan of Work, maintaining quality standards and following regulations becomes straightforward. Each stage includes checks to ensure the project meets industry regulations and quality benchmarks. This consistency prevents costly mistakes and maintains quality throughout.
We enhance the RIBA framework by adding advanced scheduling tools and financial tracking. Our platform supports all RIBA stages with real-time insights and simplified processes. These tools help you manage projects effectively and control costs, leading to better results.
What WorkflowMax offers to British architects working on ongoing projects RIBA-driven.
The RIBA Plan of Work brings structure to construction projects. Its clear stages help teams manage projects efficiently, ensuring they meet scope, budget, and timeline goals. By outlining each phase, it aligns everyone involved, reducing misunderstandings and risks.
The RIBA Plan helps everyone work together - clients, architects, contractors, and consultants. It clearly defines responsibilities. This clarity makes projects run smoother and more successfully.
Our tools complement the RIBA Plan by improving your scheduling and financial tracking. We help you handle complex jobs with real-time insights that boost your profits.